Kevin Standlee (kevin_standlee) wrote,
Kevin Standlee
kevin_standlee

  • Location:
  • Mood:

Swamp Thing (Part 6)

The ironic things about us putting all of the effort into refurbishing the swamp cooler is that we've had a cool snap, and I even had to put on a sweater this morning. However, this also means that the coats of paint that Lisa applied to the cooler pan have had more than a week to cure in preparation for being immersed in water again.

This afternoon, I completed what I think was the final step of the refurbishment.

Top Cleaning

Using a vinegar solution, I cleaned all of the calcium-lime stains off the plastic top of the cooler. This is only cosmetic, unlike some of the other encrustations that affected the performance or damaged the structure of the cooler. It does look much tidier now.

Now all we need is some hot weather and we'll be ready to go. Looking at the forecast, we won't have long to wait.
Tags: "swamp cooler"
Subscribe

  • Doing the Math

    Lisa is skipping Worldcon this year, because she wants to try the European rail trip that she did last year, this time without all of the drama and…

  • Home to the Snow

    We had lots of time this morning, so I could have a nice leisurely included breakfast before catching the shuttle over to the airport. I bought…

  • Slow Boat to Vancouver

    This afternoon we got value from our transit passes. (Single ride C$2.50, Two or more rides $5.00) The other days of this trip, we have never taken…

  • Post a new comment

    Error

    default userpic

    Your reply will be screened

    Your IP address will be recorded 

    When you submit the form an invisible reCAPTCHA check will be performed.
    You must follow the Privacy Policy and Google Terms of use.
  • 1 comment